Steel Garage & RV

Client Project

  • Garage & RV Steel Building
  • Arroyo Grande, CA
  • Specialty Tube Steel
  • 1,950 sq ft
Timeline: 2 weeks

Project Overview

This project involved the design and construction of a garage and RV storage steel building for an individual in Arroyo Grande, CA. This vast storage space is intended to provide plenty of storage for multiple full size RVs and other vehicles, equipment, and light shop work within a single integrated structure.

The building utilizes a pre-engineered specialty tube steel frame system, chosen for its durability, cost efficiency, and ability to provide large clear-span spaces.

Project Purpose: The primary goal was to create a functional, centralized workspace that would accommodate office operations (admin and project management), shop space for equipment and fabrication, storage for tools and materials, employee support areas (restrooms and circulation)
Location: Site selection supports accessibility for construction operations while complying with local zoning and building regulations typical of California commercial/light industrial developments.
Dimensions: 25 W x 78 L x 14 H, with 3:12 roof pitch, and 17 H peak
Total Usable Area: 25 ft × 78 ft = 1,950 sq ft

Layout Concept

Open shop floor. RV storage and garage space.

Structural System

Type: Specialty tube steel frame (pre-engineered metal building)

Key Features: Capability for open shop space, high strength-to-weight ratio, resistance to fire, pests, and weathering; efficient prefabrication and rapid assembly

Materials and Construction

Primary Structure: Specialty tube steel

Wall System: R-panel

Roofing: R-panel metal roofing system

Insulation: Roof insulation. Installed to improve energy efficiency, condensation, and indoor comfort

Flooring: Concrete slab for shop floor

Functional Areas

Shop Floor: Equipment workspace and RV storage

Construction Timeline

Total estimated duration: 2 weeks

Phases:

  1. Design & Engineering Drawings
  2. Site Preparation & Grading
  3. Foundation Construction
  4. Steel Frame Erection
  5. Building Enclosure (walls & roof)
  6. Final Inspection & Completion

The use of pre-engineered specialty steel tubing significantly reduces construction time compared to traditional building methods.

Budget

Status: Budget requirements have been met

Steel construction helps control costs through: Reduced labor time, minimal material waste, faster project completion

Advantages of the Design

  • Efficient use of space
  • Flexible open floor plan for changing operational needs
  • Durable, low-maintenance materials
  • Faster construction timeline
  • Cost-effective for commercial/industrial use

Conclusion

This specialy tube steel building project provides a practical and efficient solution for a construction company’s operational needs. By combining office, shop, and storage functions into a single structure, the design improves workflow, maximizes space utilization, and maintains cost and time efficiency. The use of a red iron steel / specialty tube steel frame ensures long-term durability and adaptability for future growth.

⭐⭐⭐⭐⭐ 5-Star Local Reputation

Let's Find Your Perfect Fit

Since 1996, PWS has engineered local code compliant steel buildings across California. Share your project goals below for a quick ballpark quote.